top of page

James Jones

Automated Impregnation Plant

Customer: James Jones
Location: Lockerbie, UK
Construction period: 2022–2023

The Challenge 

James Jones needed an impregnation facility that could combine capacity, traceability, and efficiency while staying adaptable to future production requirements. The goal was to create a reliable, modern plant with strong process automation, without the need for a complex transport setup.

The Solution 

We delivered a automated impregnation plant with a simple efficient transport system, tailored to James Jones’s operational needs.
The plant is designed in compliance with current standards and directives, ensuring operational safety and full process reliability. It supports both Fullcell and Lowry processes and is managed by an advanced SCADA system for monitoring, control, and reporting – providing complete traceability of all production.

WTT_Sverige_jan_2025_komprimeret_33.JPG
WTT_Sverige_jan_2025_komprimeret_127.JPG

The Benefits 

With this installation, James Jones has achieved:

  • A high-capacity impregnation facility (126,000 m³ annually)

  • Full traceability across all production runs

  • Flexible operation with both Fullcell and Lowry processes

  • Reliable process management with SCADA monitoring and reporting

  • A streamlined transport system for efficient daily operation

The Result 

James Jones now operates a modern, semi-automated impregnation plant that delivers capacity, traceability, and reliability – a future-ready investment designed for long-term performance.


bottom of page