The Challenge
James Jones needed an impregnation facility that could combine capacity, traceability, and efficiency while staying adaptable to future production requirements. The goal was to create a reliable, modern plant with strong process automation, without the need for a complex transport setup.
The Solution
We delivered a automated impregnation plant with a simple efficient transport system, tailored to James Jones’s operational needs.
The plant is designed in compliance with current standards and directives, ensuring operational safety and full process reliability. It supports both Fullcell and Lowry processes and is managed by an advanced SCADA system for monitoring, control, and reporting – providing complete traceability of all production.


The Benefits
With this installation, James Jones has achieved:
A high-capacity impregnation facility (126,000 m³ annually)
Full traceability across all production runs
Flexible operation with both Fullcell and Lowry processes
Reliable process management with SCADA monitoring and reporting
A streamlined transport system for efficient daily operation
The Result
James Jones now operates a modern, semi-automated impregnation plant that delivers capacity, traceability, and reliability – a future-ready investment designed for long-term performance.