Møre Tre AS Royal 2
Fully Automated Impregnation and Hotoil Plant
Customer: Møre Tre AS
Location: Surnadal, Norway
Construction period: 2012–2023 (expanded in 2014 and 2024)
The Challenge
Møre Tre AS required a modern facility that could combine both impregnation and Hotoil drying in one integrated solution. The goal was to secure efficiency, full production traceability, and flexible unmanned operation while leaving room for future expansions.
The Solution
We delivered a fully automated impregnation and Hotoil plant with a complete transport system, designed and tailored to Møre Tre’s operational needs.
The facility is built in accordance with all current standards and directives and offers full traceability of every production run. It supports Fullcell, Lowry, and Hotoil processes and is capable of operating unmanned for up to 24 hours.
The plant is equipped with an advanced SCADA system for monitoring, control, and reporting, including barcode scanning of packages and automated SMS alerts to staff when running autonomously during nights and weekends.
The facility has been expanded over time:
From 3 to 4 Hotoil units in 2014
From 4 to 5 Hotoil units in 2024


The Benefits
With this solution, Møre Tre AS has achieved:
A combined impregnation and Hotoil drying facility with a total capacity of 51,000 m³ CCA and 53,000 m³ Hotoil annually
Complete production traceability through advanced automation
Flexible operation across multiple impregnation and drying processes
Reliable unmanned runtime of up to 24 hours
Scalable capacity with expansions in 2014 and 2024
The Result
Møre Tre AS now operates a state-of-the-art, future-ready facility that brings together capacity, efficiency, and flexibility – securing a strong foundation for sustainable growth and long-term competitiveness.