Varberg Timber

Fully Automated Impregnation Plant

Customer: Varberg Timber
Location: Varberg, Sweden
Construction period: 2010–2011

The Challenge 

Varberg Timber needed a modern impregnation facility that could deliver high capacity, ensure full production traceability, and operate reliably with minimal staffing. The ambition was to future-proof their production setup and strengthen competitiveness through automation.

The Solution 

We delivered a fully automated impregnation plant with a complete transport system, tailored to Varberg Timber’s production requirements.
The facility is built in accordance with current standards and directives, providing a high degree of automation and full traceability of every batch. It supports both Fullcell and Lowry processes and can operate unmanned for up to 24 hours.

WTT_Sverige_jan_2025_komprimeret_33.JPG
WTT_Sverige_jan_2025_komprimeret_127.JPG

The Benefits 

With this installation, Varberg Timber gained:

  • A high-capacity impregnation plant (91,000 m³ annually)

  • Full production traceability with advanced automation

  • Flexible operation across both Fullcell and Lowry processes

  • Reduced staffing needs thanks to extended unmanned runtime

The Result 

Varberg Timber now benefits from a reliable, future-ready impregnation plant that combines capacity, efficiency, and traceability, ensuring a strong foundation for long-term growth.