Windymains

Fully Automated Impregnation Plant

Customer: Windymains
Location: Humbie, UK
Construction period: 2012–2013 (expanded in 2022)

The Challenge 

Windymains needed a modern impregnation facility with high capacity, reliability, and full traceability of production. The aim was to create a solution that could operate efficiently with minimal staffing while leaving room for future expansion.

The Solution 

We delivered a fully automated impregnation plant with an integrated transport system, designed according to current standards and directives. The facility provides full traceability of all production and can run both Fullcell and Lowry processes. It is capable of operating unmanned for up to 24 hours.


In 2022, the plant was expanded with an additional autoclave, drying lanes, and a new convoyer system, this is doubling the annual capacity to an impressive 236,000 m³.

WTT_Sverige_jan_2025_komprimeret_33.JPG
WTT_Sverige_jan_2025_komprimeret_127.JPG

The Benefits 

With this installation and later expansion, Windymains has achieved:

  • A high-capacity impregnation facility (236,000 m³ annually)

  • Full production traceability with advanced automation

  • Reliable, flexible operation across both Fullcell and Lowry processes

  • Reduced staffing needs through long unmanned runtimes

The Result 

Windymains now operates one of the largest and most advanced impregnation plants in the UK, combining capacity, efficiency, and long-term scalability in a future-ready solution.