Woodsafe
Pilot Impregnation Plant
Customer: Woodsafe
Location: Västerås, Sweden
Construction year: 2023
The Challenge
Woodsafe needed a flexible pilot plant to support development and testing of fire-retardant (FR) impregnation processes. The objective was to create a reliable and adaptable solution that could handle different chemicals.
The Solution
We delivered a pilot impregnation plant with a simple and efficient transport system, tailored to Woodsafe’s specific requirements.
The plant is designed in accordance with current standards and directives and constructed in stainless steel, making it suitable for handling a wide range of impregnation liquids.
This flexible setup allows Woodsafe to test, validate, and optimize their processes under controlled conditions.


The Benefits
With this solution, Woodsafe has achieved:
A flexible pilot plant for FR impregnation testing and development
Compatibility with multiple chemicals due to stainless steel construction
Reliable and compliant process environment
Efficient workflow with a simple transport system
The Result
Woodsafe now operates a versatile pilot facility that supports innovation, testing, and process optimization, strengthening their ability to develop high-performance fire-retardant wood solutions.













