top of page

Woodsafe

Pilot Impregnation Plant

Customer: Woodsafe
Location: Västerås, Sweden
Construction year: 2023

The Challenge 

Woodsafe needed a flexible pilot plant to support development and testing of fire-retardant (FR) impregnation processes. The objective was to create a reliable and adaptable solution that could handle different chemicals.

The Solution 

We delivered a pilot impregnation plant with a simple and efficient transport system, tailored to Woodsafe’s specific requirements.
The plant is designed in accordance with current standards and directives and constructed in stainless steel,  making it suitable for handling a wide range of impregnation liquids.

This flexible setup allows Woodsafe to test, validate, and optimize their processes under controlled conditions.

WTT_Sverige_jan_2025_komprimeret_33.JPG
WTT_Sverige_jan_2025_komprimeret_127.JPG

The Benefits 

With this solution, Woodsafe has achieved:

  • A flexible pilot plant for FR impregnation testing and development

  • Compatibility with multiple chemicals due to stainless steel construction

  • Reliable and compliant process environment

  • Efficient workflow with a simple transport system

The Result 

Woodsafe now operates a versatile pilot facility that supports innovation, testing, and  process optimization, strengthening their ability to develop  high-performance fire-retardant wood solutions.


bottom of page